Date
|
April 23, 2007
|
||
|
Agenda Item No. 6A Roll Call No. 07- Communication
No. 07-231 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Ordering construction of the following: 2007 Expanded Street Resurfacing Program - Contract 2 - Receiving bids, (5-8-07), and Setting date of hearing, (5-21-07). (Construction Estimate - $1,108,500.80).
SYNOPSIS:
Recommend the City Council proceed with construction of the improvement utilizing the method of financing referenced below. This project provides for partial and full depth patching, surface milling, and hot mix asphalt (HMA) overlay of arterial and residential streets citywide. The project addresses citizen concerns regarding the condition of city streets by preserving deteriorating infrastructure. The City Council should set dates to receive bids and hold a public hearing as required by Iowa Code.
FISCAL IMPACT:
Amount: $1,108,500.80 City Engineer's Estimate
Funding Source: 2007-2008 CIP,
Page Street-46,
ADDITIONAL INFORMATION:
The Engineering Department has
prepared plans, specifications, form of contract documents, and City Engineer’s
estimate for the construction of the 2007 Expanded Street Resurfacing Program -
Contract 2, 06-2007-012. The improvement
includes scarification of existing asphalt streets, furnish and place hot mix
asphalt, and furnish and place pavement markings, and other incidental items;
in accordance with the contract documents, including Plans File Nos.
472-141/157, at the following locations:
·
·
·
·
·
·
·
·
Grand Avenue -
·
·
·
The estimated construction cost is $1,108,500.80. The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.
PREVIOUS COUNCIL ACTION(S): NONE
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.