Date
|
May 7, 2007
|
||
|
Agenda Item No. 6B Roll Call No. 07- Communication
No. 07-274 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Ordering construction of the following: Ingersoll Avenue Streetscape Improvements - 28th to 29th Streets - Receiving bids, (5-22-07), and Setting date of hearing, (6-4-07). (Construction Estimate - $499,402.80).
SYNOPSIS:
Recommend the City Council
proceed with construction of the improvement utilizing the method of financing
referenced below. The City Council
should set dates to receive bids and hold a public hearing as required by Iowa
Code. This streetscape project is an outcome
of the Ingersoll Avenue Improvement Plan, which was developed through a planning
effort with the Ingersoll Area Association and surrounding neighborhood
associations. The overall project
includes new curbs, sidewalks, driveways, curbed planters with plantings,
pedestrian lighting, and improvements to the overhead utility facilities. Also included are storm sewer improvements,
which will be funded from the Storm Water Utility. An agreement with
Mid-American Energy for the overhead utility facility improvements and
pedestrian lighting from
FISCAL IMPACT:
Amount: $499,402.80 - City Engineer's Estimate (Phase 1 only)
Funding Source: 2007-2008 CIP,
Public funding sources include:
Project funding also includes
$200,000 in private contributions from Restoration Ingersoll.
ADDITIONAL INFORMATION:
The Engineering Department has prepared plans, specifications, form of contract documents, and City Engineer’s estimate for the construction of the Ingersoll Avenue Streetscape Improvements - 28th to 29th Streets, 04-2007-009. The improvement includes constructing curb, sidewalks, driveways, storm sewer, planters, landscaping, and other incidental items; in accordance with the contract documents, including Plans File Nos. 473-001/031 on Ingersoll Avenue from 28th Street to 29th Street, Des Moines, Iowa.
The estimated construction cost is $499,402.80. The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.
PREVIOUS COUNCIL ACTION(S):
Date: March 12, 2007
Roll Call Number: 07-447
Action: Authorization
to proceed with acquisition of necessary right-of-way and easements for the
Ingersoll Avenue Streetscape Project. (Council
Communication No. 07-131) Moved
by Mahaffey to adopt. Motion Carried
6-1.
Date: February 12, 2007
Roll Call Number: 07-204
Action: Approving
Professional Services Supplemental Agreement No. 1 with Douglas Hoerr Landscape
Architect, Inc. for additional engineering services for the Ingersoll Avenue
Streetscape Project, not to exceed $99,000.
(Council
Communication No. 07-051) Moved
by Vlassis to adopt. Motion Carried 7-0.
Date: February 12, 2007
Roll Call Number: 07-270
Action: Establishing the Ingersoll Avenue Self-Supported Municipal Improvement District (SSMID), and providing for the establishment of a capital improvement and operation fund, and levy of an annual tax. (Council Communication No. 07-067) Moved by Hensley that this ordinance be considered and given first vote for passage. Motion Carried 6-0. Mayor Cownie declares a conflict of interest and abstains from voting.
Date: February 12, 2007
Roll Call Number: 07-271
Action: (A) Final consideration of ordinance above, (waiver requested by City Manager), requires 6 votes. Moved by Hensley that the rule requiring that an ordinance must be considered and voted on for passage at two Council meetings prior to the meeting at which it is to be finally passed be suspended, that the ordinance be placed upon its final passage and that the ordinance do now pass, #14,628. Motion Carried 6-0. Mayor Cownie declares a conflict of interest and abstains from voting.
BOARD/COMMISSION ACTION(S):
Date: April 3, 2007
Roll Call Number:
Action: Urban Design
Review Board approval of proposed Phase 1 Ingersoll Avenue Streetscape project
between 28th and 29th Streets
Date: March 21, 2007
Roll Call Number: N/A
Action: Access Advisory Board review
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.