Date
|
June 4, 2007
|
||
|
Agenda Item No. 61 Roll Call No. 07- Communication
No. 07-335 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Hearing on Ingersoll Avenue Streetscape Improvements - 28th to 29th Streets: Resolution approving plans, specifications, form of contract documents, engineer’s estimate, receive and file bids, and designating lowest responsible bidder as Jasper Construction Services, Inc., Steven J. Rhoads, President, $578,089.25.
SYNOPSIS:
This is a public hearing to
allow for public input on the Ingersoll Avenue Streetscape Improvements - 28th
to 29th Streets and take the necessary actions as required by Iowa Code to
authorize a contract for construction of the proposed project. This streetscape project is an outcome of the
Ingersoll Avenue Improvement Plan, which was developed through a planning
effort with the Ingersoll Area Association and surrounding neighborhood
associations. The contract work includes
new curbs, sidewalks, driveways, curbed planters with plantings, and storm
sewer improvements, which will be funded from the Storm Water Utility.
The contract work is only a
portion of the total streetscape project.
An agreement with Mid-American Energy for the overhead utility facility
improvements and pedestrian lighting from 28th Street to 31st Street (Phase 1
and 2) with an estimated cost of $250,265 is also being presented for City
Council consideration on the June 4th agenda. Phase 2 of the streetscape from 29th to 31st
Streets will be constructed in 2008 by future contracts estimated at an
additional $1,400,000. The identified
funding sources for Phase 2 include City of
The apparent low bid for the
Ingersoll Avenue Streetscape Improvements - 28th to 29th Streets is
approximately 16% above the City Engineer's Estimate. Recent material and fuel price increases have
impacted the construction market. Additionally, the CAT grant for the project
was smaller than expected. If the total project
budget is adjusted to account for this smaller CAT grant, as well as the increased
construction cost, total project costs will exceed the current budget by $275,000. Half of this shortfall will be covered by
additional private fund raising efforts, and the other half will be covered by
additional City funds. The additional
funds will not be needed for this first contract, but will be needed for the
future contracts. It is
recommended to award this first contract.
FISCAL IMPACT: Phase 1 only
Amount: $578,089.25 Construction Contract ($499,402.80 City Engineer's Estimate)
Funding Source: 2007-2008 CIP,
Page Street-24, Ingersoll Streetscape Improvements 28th - 31st, STR221,
being:
Public funding sources include:
Project funding also includes $200,000 in private
contributions for streetscape improvements from Restoration Ingersoll.
ADDITIONAL INFORMATION:
On May 7, 2007, under Roll Call No. 07-838, the City Council received and filed plans, specifications, form of contract documents, and City Engineer's estimate for the construction of the Ingersoll Avenue Streetscape Improvements - 28th to 29th Streets. Before the City Council can enter into a contract, it must hold a public hearing and approve the proposed plans, specifications, and form of contract documents and engineer's estimate for the construction of the Ingersoll Avenue Streetscape Improvements - 28th to 29th Streets, 04-2007-009. The improvement includes constructing curb, sidewalks, driveways, storm sewer, planters, landscaping, and other incidental items; in accordance with the contract documents, including Plans File Nos. 473-001/031 on Ingersoll Avenue from 28th Street to 29th Street, Des Moines, Iowa.
Sealed bids for said improvement were submitted by the following bidders:
The bids were received and
opened at a public meeting presided over by the City Engineer in the City
Council Chambers, 2nd Floor, City Hall, 400 Robert D. Ray Drive, Des Moines,
Iowa at 11:00 a.m. on May 22, 2007.
The City Engineer has determined that the lowest responsive, responsible bid for the construction of said improvement was submitted by Jasper Construction Services, Inc., Steven J. Rhoads, President, 928 N 19th Avenue East, Newton, IA, 50208 in the amount of $578,089.25, and said bid should be accepted. The Finance Director has determined that funds are available for said improvement as stated above.
PREVIOUS COUNCIL ACTION(S):
Date: May 7, 2007
Roll Call Number: 07-838
Action: Ordering construction of the following: Ingersoll Avenue Streetscape Improvements-28th to 29th Streets – Receiving of bids, (5-22-07), and Setting date of hearing, (6-4-07). (Construction Estimate - $499,402.80). (Council Communication No. 07-274) Moved by Vlassis to adopt. Motion Carried 7-0.
Date: March 12, 2007
Roll Call Number: 07-447
Action: Authorization
to proceed with acquisition of necessary right-of-way and easements for the
Ingersoll Avenue Streetscape Project. (Council
Communication No. 07-131) Moved
by Mahaffey to adopt. Motion Carried
6-1.
Date: February 12, 2007
Roll Call Number: 07-204
Action: Approving
Professional Services Supplemental Agreement No. 1 with Douglas Hoerr Landscape
Architect, Inc. for additional engineering services for the Ingersoll Avenue
Streetscape Project, not to exceed $99,000.
(Council
Communication No. 07-051) Moved
by Vlassis to adopt. Motion Carried 7-0.
Date: February 12, 2007
Roll Call Number: 07-270
Action: Establishing the Ingersoll Avenue Self-Supported Municipal Improvement District (SSMID), and providing for the establishment of a capital improvement and operation fund, and levy of an annual tax. (Council Communication No. 07-067) Moved by Hensley that this ordinance be considered and given first vote for passage. Motion Carried 6-0. Mayor Cownie declares a conflict of interest and abstains from voting.
Date: February 12, 2007
Roll Call Number: 07-271
Action: (A) Final consideration of ordinance above, (waiver requested by City Manager), requires 6 votes. Moved by Hensley that the rule requiring that an ordinance must be considered and voted on for passage at two Council meetings prior to the meeting at which it is to be finally passed be suspended, that the ordinance be placed upon its final passage and that the ordinance do now pass, #14,628. Motion Carried 6-0. Mayor Cownie declares a conflict of interest and abstains from voting.
BOARD/COMMISSION ACTION(S):
Date: April 3, 2007
Roll Call Number:
Action: Urban Design Review Board approval of
proposed Phase 1 Ingersoll Avenue Streetscape project between 28th
and 29th Streets
Date: March 21, 2007
Roll Call Number: N/A
Action: Access Advisory Board review
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Partial payments to the contractor and final acceptance of work.