October 8, 2007
|
||
|
Agenda Item No. 5C Roll Call No. 07- Communication
No. 07-606 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Ordering construction of the following: ADA Phase 1 Exterior Improvements - Receiving bids, (11-6-07), and Setting date of hearing, (11-19-07). (Construction Estimate - $29,688).
SYNOPSIS:
Recommend the City Council proceed with construction of the improvement and set dates to receive bids and hold a public hearing, as required by Iowa Code, utilizing the method of financing referenced below.
A study of City of
FISCAL IMPACT:
Amount: $29,688 City Engineer's Estimate
Funding
Source:
2007-2008 CIP, Page Buildings-4,
ADDITIONAL
INFORMATION:
On
July 23, 2007, under Roll Call No. 07-1463, the City Council approved a
resolution to reject bids for ADA Transition Plan Improvements - Phase 1
because no bids were received, and to close the hearing on the plans,
specifications, form of contract documents and engineer’s estimate. The City Engineer contacted the five general
contractors that obtained bidding documents to determine why they did not bid
the project. Based on these
conversations, Engineering Staff has redesigned and repackaged the work into
different, more attractive projects that limit the scope of the work done under
each project. It is hoped that these
changes will make the work more attractive to potential bidders, and the City
Engineer now recommends that the project be rebid. The
The Engineering Department has prepared plans, specifications, form of contract documents, and City Engineer’s estimate for the construction of the ADA Phase 1 Exterior Improvements, 10-2008-002. The improvement includes site improvements to resolve non-ADA compliant items listed in the ADA Transition Plan as approved by the Access Advisory Board; all work in accordance with the contract documents including Plan File Nos.474-109/115 at multiple locations, Argonne Armory Building, Cownie Soccer Park, Gray's Lake, and SE/Chesterfield Community Center in Des Moines, Iowa.
The estimated construction cost is $29,688. The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.
PREVIOUS
COUNCIL ACTION(S):
Date: July 23, 2007
Roll Call Number: 07-1463
Action: Resolution to REJECT all bids and close the hearing on plans, specifications, form of contract documents and Engineer’s estimate for ADA Transition Plan Improvements-Phase 1, (no bids were received). (Council Communication No. 07-456) Moved by Hensley to adopt. Motion Carried 7-0.
Date: June 4, 2007
Roll Call Number: 07-1040
Action: Ordering construction of the following: ADA
Transition Plan Improvements- Phase 1 – Receiving of bids, (7-10-07), and
Setting date of hearing, (7-23-07).
(Construction Estimate - $361,542).
(Council
Communication No. 07-331) Moved by Vlassis to adopt. Motion Carried 7-0.
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.