Date
|
November 19, 2007
|
||
|
Agenda Item No. 58 Roll Call No. 07- Communication
No. 07-688 Submitted
by: Jeb E. Brewer, P.E. City Engineer
|
||||
AGENDA HEADING:
Hearing on ADA Phase 1 Exterior
Improvements: Resolution approving
plans, specifications, form of contract documents, engineer’s estimate, receive
and file bids, and designating lowest responsible bidder as T K Concrete Inc.,
Tony J. VerMeer, President,
SYNOPSIS:
This is a public hearing to
allow for public input on the ADA Phase 1 Exterior Improvements and take the
necessary actions as required by Iowa Code to authorize a contract for
construction of the proposed project. A
study of City of
FISCAL IMPACT:
Amount: $25,772 Construction Contract ($29,688 City Engineer's Estimate)
Funding Source: 2007-2008 CIP,
Page Buildings-4,
ADDITIONAL INFORMATION:
On July 23, 2007, under Roll
Call No. 07-1463, the City Council approved a resolution to reject bids for ADA
Transition Plan Improvements - Phase 1 because no bids were received, and to
close the hearing on the plans, specifications, form of contract documents and
engineer’s estimate. The City Engineer
contacted the five general contractors that obtained bidding documents to
determine why they did not bid the project.
Based on these conversations, Engineering Staff has redesigned and
repackaged the work into different, more attractive projects that limit the
scope of the work done under each project.
It is hoped that these changes will make the work more attractive to
potential bidders, and the City Engineer now recommends that the project be
rebid. The
On October 8, 2007, under Roll Call No. 07-1917, the City Council received and filed plans, specifications, form of contract documents, and City Engineer's estimate for the construction of the ADA Phase 1 Exterior Improvements. Before the City Council can enter into a contract, it must hold a public hearing and approve the proposed plans, specifications, and form of contract documents and engineer's estimate for the construction of the ADA Phase 1 Exterior Improvements, 10-2008-002. The improvement includes site improvements to resolve non-ADA compliant items listed in the ADA Transition Plan as approved by the Access Advisory Board; all work in accordance with the contract documents including Plan File Nos.474-109/115 at multiple locations, Argonne Armory Building, Cownie Soccer Park, Gray's Lake, and SE/Chesterfield Community Center in Des Moines, Iowa.
Sealed bids for said improvement were submitted by the following bidders:
T K Concrete Inc.,
Schroeder Companies, Inc.,
The bids were received and
opened at a public meeting presided over by the City Engineer in the City
Council Chambers, 2nd Floor, City Hall, 400 Robert D. Ray Drive, Des Moines,
Iowa at 11:00 a.m. on November 6, 2007.
The City Engineer has determined that the lowest responsive, responsible bid for the construction of said improvement was submitted by T K Concrete Inc. in the amount of $25,772, and said bid should be accepted. The Finance Director has determined that funds are available for said improvement as stated above.
PREVIOUS COUNCIL ACTION(S):
Date: October 8, 2007
Roll Call Number: 07-1917
Action: Ordering
construction of ADA Phase 1
Exterior Improvements – Receiving of bids, (11-6-07), and Setting date of
hearing, (11-19-07). (Construction
Estimate - $29,688). (Council
Communication No. 07-606) Moved by Hensley to adopt. Motion Carried 7-0.
Date: July 23, 2007
Roll Call Number: 07-1463
Action: Resolution to REJECT all bids and close the hearing on plans, specifications, form of contract documents and Engineer’s estimate for ADA Transition Plan Improvements-Phase 1, (no bids were received). (Council Communication No. 07-456) Moved by Hensley to adopt. Motion Carried 7-0.
Date: June 4, 2007
Roll Call Number: 07-1040
Action: Ordering construction of the following: ADA
Transition Plan Improvements- Phase 1 – Receiving of bids, (7-10-07), and
Setting date of hearing, (7-23-07).
(Construction Estimate - $361,542).
(Council
Communication No. 07-331) Moved by Vlassis to adopt. Motion Carried 7-0.
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Partial payments to the contractor and final acceptance of work.