Date
|
January 7, 2008
|
||
|
Agenda Item No. 6C Roll Call No. 08- Communication
No. 08-017 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Ordering
construction of the following:
SYNOPSIS:
Proceed with construction of the improvement and set dates to receive bids and hold a public hearing, as required by Iowa Code, utilizing the method of financing referenced below. Recent bridge inspections have determined that this bridge has deteriorated beyond the point where it can be rehabilitated. The existing bridge structure, which is structurally and hydraulically deficient, will be replaced with a triple 12' x 6' x 64' long reinforced concrete box culvert.
FISCAL IMPACT:
Amount: $550,741.70 City Engineer's Estimate
Funding
Source:
2007-2008 CIP, Page Bridge-13,
ADDITIONAL INFORMATION:
The
Engineering Department has prepared plans, specifications, form of contract
documents, and City Engineer’s estimate for the construction of the
The estimated
construction cost is $550,741.70. The
proposed plans, specifications, and form of contract documents are available
for public inspection in the City Engineer's Office.
PREVIOUS
COUNCIL ACTION(S):
Date: September 11, 2006
Roll Call Number: 06-1742
Action: Approving
Professional Services Agreement with Shuck-Britson, Inc. for evaluation, design
and construction phase services for replacement of
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.