Agenda Item No. 8B Roll Call No. 08- Communication
No. 08-065 Submitted
by: Jeb E. Brewer, P.E. City Engineer
|
||||
AGENDA HEADING:
Ordering construction of the following: 1624 Pennsylvania Avenue Storm Sewer Repair - Receiving bids, (2-26-08), and Setting date of hearing, (3-10-08). (Construction Estimate - $100,385).
SYNOPSIS:
Recommend the City Council proceed
with construction of the improvement and set dates to receive bids and hold a
public hearing, as required by Iowa Code, utilizing the method of financing
referenced below. This project
provides for the replacement of a portion an existing brick storm sewer that
has failed between
FISCAL IMPACT:
Amount: $100,385 - City Engineer's Estimate
Funding Source: 2007-2008 CIP, Page Storm-5, City-wide Storm Water Utility Projects, STE057, Storm Water Utility Funds
ADDITIONAL INFORMATION:
The Engineering Department has
prepared plans, specifications, form of contract documents, and City Engineer’s
estimate for the construction of the
The estimated construction cost is $100,385. The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.
PREVIOUS COUNCIL ACTION(S): NONE
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.