Date
|
April 7, 2008
|
||
|
Agenda Item No. 7B Roll Call No. 08- Communication
No. 08-193 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Ordering construction of the
following: Ingersoll Avenue Streetscape
Enhancements – 28th to
SYNOPSIS:
Recommend the City Council proceed
with construction of the improvement and set dates to receive bids and hold a
public hearing, as required by Iowa Code, utilizing the method of financing
referenced below. This project
provides for the installation of decorative metal railings on the planter beds,
trash receptacles, benches, bicycle racks, and planter urns with landscape
material. This project is the final
phase of the Ingersoll Avenue Streetscape
Improvements from
FISCAL IMPACT:
Amount: $292,772 City Engineer's Estimate
Funding Source: 2007-2008 CIP, Page Street-24, Ingersoll Streetscape Improvements – 29th to 31st, STR221, Being: $261,500 in private contributions for streetscape improvements from Restoration Ingersoll and $31,272 in G. O. Bonds.
ADDITIONAL INFORMATION:
This streetscape project is the
outcome of an on-going planning effort with the Ingersoll Area Association
(IAA) and the surrounding neighborhoods.
The development and implementation of a plan for
To expedite construction of the project, construction was split into three phases:
On February 12, 2007, the City Council approved the establishment of the Ingersoll Avenue Self-Supported Municipal Improvement District (SSMID). This district matches the streetscape project area boundaries and will be used to assist with funding the maintenance of the improvements. The SSMID petition was signed by the owners of 59% of the taxable properties in the district (20 of 34). These signatures also represent property ownership with an assessed value of 72.7% of the total assessed value for taxable property in the District ($8.793 million of $12.095 million). These figures greatly exceed the require minimum of 25% of the owners representing 25% of the assessed value of the district as required by the State Code.
The Engineering Department has prepared plans, specifications, form of contract documents, and City Engineer’s estimate for the construction of the Ingersoll Avenue Streetscape Enhancements – 28th to 31st Street, 04-2008-006. The improvement includes installing decorative metal railing, trash receptacles, benches, planter urns, bicycle racks, and other incidental items; in accordance with the contract documents, including Plans File Nos. 489-058/067 on Ingersoll Avenue from 28th Street to 31st Street, Des Moines, Iowa.
The estimated construction cost is $292,772. The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.
PREVIOUS COUNCIL ACTION(S):
Date: March 10, 2008
Roll Call Number: 08-364
Action: Ordering construction of the following:
(A) Ingersoll Avenue Streetscape Improvements - 29th to 31st Streets – Receiving of bids, (3-18-08), and Setting date of hearing, (4-7-08). (Construction Estimate - $1,061,823). (Council Communication No. 08-118) Moved by Hensley to adopt. Motion Carried 7-0.
Date: June 4, 2007
Roll Call Number: 07-1117
Action: On
Ingersoll Avenue Streetscape Improvements-28th to 29th
Streets: Resolution approving plans, specifications, form of contract
documents, Engineer’s Estimate and designating lowest responsible bidder as
Jasper Construction Services, Inc., (Steven J. Rhoads, President),
$578,089.25. (Council
Communication No. 07-335) Moved by Hensley to adopt. Motion Carried 6-0. Mayor Cownie declares a conflict of interest
and abstains from voting.
Date: June 4, 2007
Roll Call Number: 07-1118
Action: (A) Approving contract and bond and permission to sublet. Moved by Hensley to adopt. Motion Carried 6-0. Mayor Cownie declares a conflict of interest and abstains from voting.
Date: February 12, 2007
Roll Call Number: 07-270
Action: Establishing the Ingersoll Avenue Self-Supported Municipal Improvement District (SSMID), and providing for the establishment of a capital improvement and operation fund, and levy of an annual tax. (Council Communication No. 07-067) Moved by Hensley that this ordinance be considered and given first vote for passage. Motion Carried 6-0. Mayor Cownie declares a conflict of interest and abstains from voting.
Date: February 12, 2007
Roll Call Number: 07-271
Action: (A) Final consideration of ordinance above, (waiver requested by City Manager), requires 6 votes. Moved by Hensley that the rule requiring that an ordinance must be considered and voted on for passage at two Council meetings prior to the meeting at which it is to be finally passed be suspended, that the ordinance be placed upon its final passage and that the ordinance do now pass, #14,628. Motion Carried 6-0. Mayor Cownie declares a conflict of interest and abstains from voting.
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.
For more information on this and other agenda items, please call
the City Clerk’s Office at 515-283-4209 or visit the Clerk’s Office on the
second floor of City Hall,