Agenda
Item No. 9 Roll
Call No. 08- Communication No. 08-222 Submitted by: Jeb E. Brewer, P.E. City
Engineer |
||||
AGENDA HEADING:
Approving
Change Order No. 2 with Baker Electric, Inc. for additional work on the Court
Avenue Streetscape Rehabilitation for a total not to exceed $44,338.50.
SYNOPSIS:
Approval of Change Order No. 2 in an amount not to exceed $44,338.50
with Baker Electric, Inc., John Layland, Executive Vice President,
FISCAL IMPACT:
Amount:
$44,338.50
Funding
Source: 2008-09 CIP,
ADDITIONAL INFORMATION:
The Court Avenue Streetscape
Rehabilitation Project includes removing tree grates, constructing planting
beds, landscaping, and replacing the street and pedestrian lights to coincide
with recent development in the Court Avenue corridor between
The new light fixtures selected
for Court Avenue have improved lighting characteristics and energy efficiency
over the existing fixtures. However, the
actual poles selected and delivered have a slightly different mounting
arrangement than envisioned in the preliminary design, which resulted in
problems connecting them to the existing bases.
Alternate poles were investigated to find a different mounting
arrangement. However, after considering
light characteristics, energy use, and historic aesthetics, it was determined
that the selected pole fixture was preferable and that the existing bases could
be modified to accept the poles.
This change order will include
installing extenders to the existing anchor bolts, forming and pouring new
concrete tops on the bases, and cutting and reinstalling brick around the bases
that require modification for the selected poles along Court Avenue.
PREVIOUS COUNCIL ACTION(S):
Date: December 3, 2007
Roll Call Number:
07-2338
Action: Approving
contract and bond, and permission to sublet. Moved by Hensley to
adopt. Motion Carried 7-0.
Date: December 3, 2007
Roll Call Number:
07-2337
Action: On
Court Avenue Streetscape Rehabilitation:
Resolution approving plans, specifications, form of contract documents,
Engineer’s Estimate and designating lowest responsible bidder as Baker
Electric, Inc., (Britt Baker, CEO), $626,358.41. (Council
Communication No. 07-720) Moved by Hensley to adopt. Motion Carried 7-0.
Date: May 7, 2007
Roll Call Number: 07-840
Action: Approving Professional Services Agreement for
the following: (A) Design
and construction phase services for Court Avenue Streetscape Rehabilitation,
Brian Clark and Associates, not to exceed $80,000. (Council
Communication No. 07-264) Moved by Vlassis to adopt. Motion Carried 7-0.
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE
COMMITMENTS:
Normal
Council actions on construction contracts.