Date
|
April 21, 2008
|
||
|
Agenda Item No. 8A Roll Call No. 08- Communication
No. 08-231 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Ordering construction of the following: 12th, 13th, and Mulberry Streets Widening - Receiving bids, (5-6-08), and Setting date of hearing, (5-19-08). (Construction Estimate - $350,000).
SYNOPSIS:
Recommend the City Council
proceed with construction of the improvement and set dates to receive bids and hold
a public hearing, as required by Iowa Code, utilizing the method of financing
referenced below. This project provides for widening
FISCAL IMPACT:
Amount: $350,000 City Engineer's Estimate
Funding Source: 2008-2009 CIP,
ADDITIONAL INFORMATION:
The Engineering Department has prepared plans, specifications, form of contract documents, and City Engineer’s estimate for the construction of the 12th, 13th, and Mulberry Streets Widening, 06-2007-009. The improvement includes construction of 10-inch PCC pavement on a 6-inch modified subbase with subdrains on a segment of 12th Street, and placing an 8-inch PCC pavement base with a 2-inch overlay on a 6-inch modified subbase with subdrains on 12th and Mulberry Streets, also placing an 8-inch PCC pavement base with a 2-inch overlay on 13th Street, pavement removal, special compaction of subgrade, storm sewer and intakes, traffic signal system, and other incidental items; in accordance with the contract documents, including Plans File Nos. 489-113/134, on 12th Street from Mulberry Street to Cherry Street, 13th Street from Locust Street to Walnut Street, and Mulberry Street from 12th Street to 13th Street, Des Moines, Iowa.
The estimated construction cost is $350,000. The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.
PREVIOUS COUNCIL ACTION(S): NONE
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.