Agenda Item No. 8B Roll Call No. 08- Communication
No. 08-232 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Ordering construction of the following: 2008 Park Playground Curbing - Receiving bids, (5-6-08), and Setting date of hearing, (5-19-08). (Construction Estimate - $50,700).
SYNOPSIS:
Recommend the City Council proceed
with construction of this improvement and set dates to receive bids and hold a
public hearing, as required by Iowa Code, utilizing the method of financing as referenced
below. This provides for the
installation of curbing and engineered wood fiber surfacing for the existing
playground equipment at
FISCAL IMPACT:
Amount: $50,700 City Engineer's Estimate
Funding Source: 2008-2009 CIP,
Page Parks-15, Neighborhood Park Improvements, PKS137, being $28,700 in G. O.
Bonds from PKS137 and $22,000 in G. O. Bonds from
ADDITIONAL INFORMATION:
The Engineering Department has
prepared plans, specifications, form of contract documents, and City Engineer’s
estimate for the construction of the 2008 Park Playground Curbing,
11-2008-008. The improvement includes
construction of PCC curbing, engineered wood fibers surfacing and PCC sidewalk;
all in accordance with the contract documents including Plan File Nos.
489-109/112 at
The estimated construction cost is $50,700. The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.
PREVIOUS COUNCIL ACTION(S): NONE
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.