Date
|
June 9, 2008
|
||
|
Agenda Item No. 6B Roll Call No. 08- Communication
No. 08-348 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Ordering construction of the following: Fleur Drive Planters at Gray's
SYNOPSIS:
Recommend the City Council
proceed with construction of the improvement and set dates to receive bids and
hold a public hearing, as required by Iowa Code, utilizing the method of
financing referenced below. This project
provides for the construction of a planter in the median of
FISCAL IMPACT:
Amount: $317,776 City Engineer's Estimate
Funding Source: 2008-2009 CIP, Page Parks-10, Fleur Drive Planters, PKS170, Being: $254,220.80 in FHWA Surface Transportation (STP) Funds (80% of the total cost of eligible construction items not to exceed $300,000) and $63,555.20 in G. O. Bonds
ADDITIONAL INFORMATION:
In
2003, Des Moines Water Works (DMWW) and
Ruan Companies, (John Ruan III, Chairman and CEO, 3200 Ruan Center, 666 Grand
Avenue, Des Moines, Iowa, 50309) began reconstructing medians along Fleur Drive
with planter beds designed by Douglas Hoerr Landscape Architecture (Douglas
Hoerr, President, 850 W Jackson, Ste 800, Chicago, IL 60607). Since that time all but one median between
The Iowa Department
of Transportation (IDOT) through the Des Moines Area Metropolitan Planning
Organization (MPO) has allocated $300,000 of matching federal funds for these
planters. These federal funds can only
be expended on a project meeting the IDOT federal funds process. DMWW has asked the City of
The Engineering Department has
prepared plans, specifications, form of contract documents, and City Engineer’s
estimate for the construction of the Fleur Drive Planters at Gray's
The estimated construction cost is $317,776. The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.
PREVIOUS COUNCIL ACTION(S):
Date: March 10, 2008
Roll Call Number: 08-367
Action: Approving
execution of Iowa Department of Transportation (IDOT) Agreement for
Date: November 5, 2007
Roll Call Number: 07-2113
Action: Approving Professional Services Agreement with Calhoun-Burns & Associates for design of the Fleur Drive Planters, not to exceed $38,051.20. (Council Communication No. 07-660) Moved by Kiernan to adopt. Motion Carried 7-0.
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.
For more
information on this and other agenda items, please call the City Clerk’s Office
at 515-283-4209 or visit the Clerk’s Office on the second floor of City Hall,