Date
|
June 23, 2008
|
||
|
Agenda Item No. 46 Roll Call No. 08- Communication
No. 08-369 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Hearing on 2008 City-wide PCC Pavement Restoration Program: Resolution approving plans, specifications, form of contract documents, engineer’s estimate, receive and file bids, and designating lowest responsible bidder as T K Concrete Inc., Tony J. VerMeer, President, $166,140.
SYNOPSIS:
This is a public hearing to allow for public input on the 2008 City-wide PCC Pavement Restoration Program and take the necessary actions as required by Iowa Code to authorize a contract for construction of the proposed project. This project provides for timely maintenance of Portland Cement Concrete (PCC) residential and arterial streets utilizing full depth removal and replacement of distressed panels to improve the surface condition and extend the useful service life of the streets.
FISCAL IMPACT:
Amount: $166,140 Construction Contract ($174,000 City Engineer's Estimate)
Funding Source: 2008-2009 CIP,
ADDITIONAL INFORMATION:
On May 19, 2008, under Roll Call
No. 08-852, the City Council received and filed plans, specifications, form of
contract documents, and City Engineer's estimate for the construction of the
2008 City-wide PCC Pavement Restoration Program. Before the City Council can enter into a
contract, it must hold a public hearing and approve the proposed plans,
specifications, and form of contract documents and engineer's estimate for the
construction of the 2008 City-wide PCC Pavement Restoration Program,
06-2008-016. The improvement is to
furnish, place, cure, saw, and seal PCC pavement patches of various thickness
in a cooperative effort with the City of
·
•Bel Aire Road from
·
•
·
•
·
•
·
•
·
•Cummins Parkway from
·
•
·
•
·
•
·
•
Sealed bids for said improvement were submitted by the following bidders:
T K Concrete Inc.,
Concrete Technologies, Inc.,
Castle Concrete Services Inc.,
The bids were received and opened at a public meeting presided over by the City Engineer in the City Council Chambers, 2nd Floor, City Hall, 400 Robert D. Ray Drive, Des Moines, Iowa at 11:00 a.m. on June 10, 2008.
The City Engineer has determined
that the lowest responsive, responsible bid for the construction of said
improvement was submitted by T K Concrete Inc., Tony J. VerMeer, President,
PREVIOUS COUNCIL ACTION(S):
Date: May 19, 2008
Roll Call Number: 08-852
Action: Ordering construction of the following: 2008 City-Wide PCC Pavement Restoration Program – Receiving of bids, (6-10-08), and Setting date of hearing, (6-23-08). (Construction Estimate - $174,000). (Council Communication No. 08-292). Moved by Vlassis to adopt. Motion Carried 7-0.
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Partial payments to the contractor and final acceptance of work.