Date
|
June 23, 2008
|
||
|
Agenda Item No. 6B Roll Call No. 08- Communication
No. 08-374 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA HEADING:
Ordering construction of the following: High Street Realignment - 10th Street to 14th Street - Phase 1 - Receiving bids, (7-15-08), and Setting date of hearing, (7-28-08). (Construction Estimate - $680,000).
SYNOPSIS:
Recommend the City Council proceed with construction of the improvement and set dates to receive bids and hold a public hearing, as required by Iowa Code, utilizing the method of financing referenced below.
FISCAL IMPACT:
Amount: $680,000 (City Engineer's Estimate)
Funding Source: 2008-2009 CIP,
Page Street-18, High Street Realignment -
ADDITIONAL INFORMATION:
The Engineering Department has prepared plans, specifications, form of contract documents, and City Engineer’s estimate for the construction of the High Street Realignment - 10th Street to 14th Street - Phase 1, 06-2008-004. The improvement includes clearing and grubbing, pavement removal and replacement, sidewalk removal and replacement, excavation, storm sewer, hydrant relocation, traffic signals, pavement markings, construction survey, sodding and site restoration; all in accordance with the contract documents including Plan File Nos. 490-10/50 at High Street from 10th Street to 12th Street, Des Moines, Iowa.
The estimated construction cost is $680,000. The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.
PREVIOUS COUNCIL ACTION(S):
NONE
BOARD/COMMISSION ACTION(S): NONE
ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:
Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.