Agenda Item No. 5B Roll Call No. 09- Communication
No. 09-149 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA
HEADING:
Ordering
construction of the following: Trestle
to Trestle Trail Realignment - Receiving bids, (3-24-09), and Setting date of
hearing, (4-6-09). (Construction
Estimate - $277,750).
SYNOPSIS:
Recommend
the City Council proceed with construction of the improvement and set dates to
receive bids and hold a public hearing, as required by Iowa Code, utilizing the
method of financing referenced below.
During the flood of 2008, the levee along
FISCAL
IMPACT:
Amount: $277,750 City Engineer's Estimate
Funding
Source: 2009-2010 CIP, Page
Parks-22, Recreation Trails, PKS045, being $100,000 anticipated approximate
FEMA reimbursement with the remaining $177,750 in Des Moines G. O. Bonds
ADDITIONAL
INFORMATION:
The
Engineering Department has prepared plans, specifications, form of contract
documents, and City Engineer’s estimate for the construction of the Trestle to
Trestle Trail Realignment, 11-2009-007.
The improvement includes realignment of the bike trail as a result of
the restoration of a levee from the Floods of 2008. Construction will include paving the trail,
removal of fence, installation of ballards, extending
storm sewer outlets, sidewalk ramps, access driveway, restoration and other
incidental items; in accordance with the contract documents including Plan File
Nos. 496-129/152, along the east side of M.L. King Jr. Parkway between Clarkson
Avenue and Madison Avenue, Des Moines, Iowa.
The
estimated construction cost is $277,750.
The proposed plans, specifications, and form of contract documents are
available for public inspection in the City Engineer's Office.
PREVIOUS
COUNCIL ACTION(S):
Date: November 24, 2008
Roll Call Number: 08-2086
Action: On M. L. King Jr.
Parkway Levee Restoration: Resolution
approving plans, specifications, form of contract documents, Engineer’s
Estimate and designating lowest responsible bidder as Elder Corporation, (Jared
R. Elder II, President), $175,246.25. (Council
Communication No. 08-704) Moved by Vlassis to
adopt. Motion Carried 7-0.
Date: November 24, 2008
Roll
Call Number:
08-2087
Action: (A) Approval of contract and bond and
permission to sublet. Moved by Vlassis to adopt.
Motion Carried 7-0.
BOARD/COMMISSION
ACTION(S): NONE
ANTICIPATED
ACTIONS AND FUTURE COMMITMENTS:
Anticipated
actions include public hearing, receive and file bids, designate lowest bidder,
and approve contract and bond; also partial payments to the contractor and
final acceptance of work.
For more information on this
and other agenda items, please call the City Clerk’s Office at 515-283-4209 or
visit the Clerk’s Office on the second floor of City Hall,