AGENDA
HEADING:
Hearing
on Southeast Connector Paving - SE
4th Street to SE 9th Street: Resolution approving plans, specifications,
form of contract documents, engineer’s estimate, receive and file bids, and
designating lowest responsible bidder as Elder Corporation, Jared R.
Elder II, President, 5088 E.
University Avenue, Des Moines, IA, 50327,
$3,356,000.
SYNOPSIS:
This
is a public hearing to allow for public input on the Southeast Connector Paving
- SE 4th Street
to SE 9th Street
and take the necessary actions as required by Iowa Code to authorize a contract
for construction of the proposed project.
This project is the first phase of street construction of the four-lane
extension of the east/west segment of Martin Luther King Jr. Parkway across the
Des Moines River to SE 14th Street (US 65/69), and includes construction of the
Southeast Connector from SE 4th Street to SE 9th Street except for the
intersection at SE 6th Street which must be phased to maintain traffic in the
area.
FISCAL
IMPACT:
Amount: $3,356,000 Construction Contract ($3,750,000
City Engineer's Estimate)
Funding
Source: 2009-2010 CIP, Page
Street-36, Southeast Connector - S.E.
Sixth Street to S.E. 14th, STR219, being:
·
$552,516.34 in Federal IA116 Funds for 80% eligible construction
(maximum $765,646) with $138,129.08 in Des Moines Tax Increment Bonds for 20%
Local match on Division 1 work from SE 4th - SE 6th Streets funded under
STR214, Page Street-35;
·
$1,845,850.48 in Federal Transportation, Community, and System
Preservation (TCSP) Program Funds for 80% eligible construction (maximum
$2,116,550) with $461,462.62 in Des Moines Tax Increment Bonds for the 20%
Local match on Division 2 work from SE 6th - SE 9th Streets funded under
STR219, Page Street-36; and
·
$358,041.49 from Des Moines Water Works for Division 3 water main
construction not Federal eligible.
ADDITIONAL
INFORMATION:
On
March 7, 2005, by Roll Call 05-530, the City Council approved execution of an
Iowa Department of Transportation (IDOT) Agreement for the Southeast Connector; and by Roll Call 05-531, the City Council
approved the professional services agreement with Kirkham Michael &
Associates, (Roger Helgoth, President, Omaha, NE). In
cooperation with City staff, the consultant team has completed design of the
Southeast Connector Paving improvements from SE 4th Street to SE 9th Street, which have been approved
by the IDOT. Improvements to SE 6th
Street are being coordinated with other City
projects and will be included in the next paving project. In accordance with the IDOT Agreement, the
IDOT agreed to advertise, receive, open, and tabulate the sealed bids on
February 17, 2009.
On
February 9, 2009, under Roll Call No. 09-164, the City Council received and
filed plans, specifications, form of contract documents, and City Engineer's
estimate for the construction of the Southeast Connector Paving - SE 4th Street to SE 9th Street. Before the City Council can enter into a
contract, it must hold a public hearing and approve the proposed plans,
specifications, and form of contract documents and engineer's estimate for the
construction of the Southeast Connector Paving - SE 4th Street to SE 9th Street, 06-2009-001. The improvements includes construction of a
Portland Cement Concrete Pavement 10 inches thick on the Southeast Connector
and 8 inches thick on SE 5th, SE 7th, SE 8th, and SE 9th Streets with various
width pavements and medians; together with the necessary removals, earthwork,
clearing, grubbing, erosion control, sidewalks, driveways, recreational trails,
pavement subdrains, storm sewers, water mains, traffic controls, traffic
signals, street lighting, intersection enhancements, landscaping, and
irrigation system; all in accordance with the contract documents including Plan
File Nos. 494-001/113 on the Southeast Connector from SE 4th Street to SE 9th Street, Des
Moines, Iowa.
Sealed
bids for said improvement were submitted by the following bidders:
Elder
Corporation, Des Moines, IA
Sternquist
Construction Inc., Indianola,
IA
Corell
Contractor, Inc., West Des Moines,
IA
Concrete
Technologies, Inc., Urbandale,
IA
McAninch
Corporation, West Des Moines,
IA
Cedar
Valley Corp., Waterloo, IA
Jasper
Construction Services, Inc., Newton,
IA
Hawkeye
Paving Corp., Bettendorf, IA
The
bids, in accordance with a previously approved IDOT Agreement, were received
and opened by the IDOT on February 17, 2009.
The attached tabulation of bids by the Iowa DOT for said improvement be
and is hereby received, and filed.
The
City Engineer has determined that the lowest responsive, responsible bid for
the construction of said improvement was submitted by Elder Corporation, Jared
R. Elder II, President, in the amount of $3,356,000, and said bid should
be accepted. The Finance Director has determined that funds are available for
said improvement as stated above.
PREVIOUS
COUNCIL ACTION(S):
Date: February 9, 2009
Roll
Call Number: 09-164
Action: Ordering construction of the following: Southeast Connector Paving – SE 4th Street
to SE 9th Street: Receiving of bids, (2-24-09), and Setting
date of hearing, (3-9-09). (Construction Estimate - $3,750,000). (Council Communication No. 09-069) Moved by Vlassis to
adopt. Motion Carried 7-0.
Date: March 7,
2005
Roll Call Number:
05-530
Action:
Approving items regarding Southeast Connector Project: Execution of Iowa
Department of Transportation Agreement.
(Council
Communication No. 05-098) Moved by Hensley to adopt.
Motion Carried 7-0.
Date: March 7,
2005
Roll Call Number:
05-531
Action:
Approving items regarding Southeast Connector Project: Execution of
Professional Services Agreement with Kirkham Michael & Associates, (Dale
Miller, President, Omaha, NE) for design services, not to exceed
$4,000,000. (Council
Communication No. 05-099) Moved by Brooks to adopt.
Motion Carried 7-0.
BOARD/COMMISSION
ACTION(S):
Date: February 17,
2009
Roll Call Number:
NA
Action: Urban Design
Review Board recommended approval of the final design for the SE Connector from
SW 2nd to SE 9th
Street, including street design, bridge
aesthetics, corridor lighting, landscaping and hardscape
features.
ANTICIPATED
ACTIONS AND FUTURE COMMITMENTS:
Partial
payments to the contractor and final acceptance of work.
For more
information on this and other agenda items, please call the City Clerk’s Office
at 515-283-4209 or visit the Clerk’s Office on the second floor of City Hall, 400 Robert D. Ray Drive. Council agendas are available to the public
at the City Clerk’s Office on Thursday afternoon preceding Monday’s Council
meeting. Citizens can also request to
receive meeting notices and agendas by email by calling the Clerk’s Office or
sending their request via email to cityclerk@dmgov.org.