Date
|
May 4, 2009
|
||
|
Agenda
Item No. 7 Roll
Call No. 09- Communication No.
09-275 Submitted by: Jeb E. Brewer, P.E. City
Engineer |
||||
AGENDA HEADING:
Approving and authorizing the
execution of Iowa Department of Transportation Agreement for E. Indianola
Avenue Widening – S.E. 14th Street to S.E. 16th Court.
SYNOPSIS:
Recommend approval of Iowa
Department of Transportation (IDOT) Agreement No. 2010-TS-015 for $500,000 in
Traffic Safety Improvement Program project funding for E. Indianola Avenue
Widening – S.E. 14th Street to S.E. 16th Court. This project is the first phase of the E.
Indianola Avenue Widening project, which will reconstruct E. Indianola Avenue
to increase traffic capacity, improve safety, and provide pedestrian and
bicycle accommodations.
FISCAL IMPACT:
Amount: $4,700,000
Funding
Source: Various funding sources as follows:
ADDITIONAL INFORMATION:
On October 8,
2007, by Roll Call No. 07-1994, the City Council approved the East Indianola
Avenue Corridor Study. On March 10,
2008, by Roll Call No. 08-435, the City Council approved the design concept for
bicycle and pedestrian accommodations on the East Indianola Avenue Widening –
S.E. 14th Street to Army Post Road project.
East Indianola
Avenue from S.E. 14th Street to E. Army Post Road is intended to be
reconstructed as a “complete street” design.
A “complete street” design includes accommodation for not only vehicular
traffic, but also mass transit, pedestrians, commuter and recreational bicyclists,
and other recreational users. Providing
facilities for all users helps reduce the number of single-occupant vehicles
using the roadway, and also encourages alternative commuting options and
recreational activities. The bicycle
features in particular are an important part of the City’s effort to gain
recognition as a bike friendly community.
The design concept
included a 4-foot sidewalk on the east side of the roadway and an 8-foot
multi-purpose trail (sidepath) on the west side. Both the sidewalk and sidepath will provide a
safe route for students walking or biking to either Jackson Elementary School
or to Weeks Middle School at Indianola Avenue & Park Avenue. The 8-foot sidepath will also provide a
continuous connection to the 10’ trail through Ewing Park, and will accommodate
pedestrians, recreational bikers, and in-line skaters.
From S.E. 14th
Street to Ewing Park, the proximity of existing homes and the limited available
right-of-way width make a “complete street” design much more challenging. Two traffic lanes in each direction are still
required to handle the anticipated traffic.
A raised median will not be included in this section, but a two-way
left-turn lane will be provided from Jackson Elementary School to Ewing
Park. From Evergreen Avenue to Jackson
Elementary School, this center turn lane will not be included in order to
minimize the total roadway width and the impacts to adjacent homes and
businesses. From Evergreen Avenue north
to S.E. 14th Street, turn lanes will again be provided to
accommodate the heavy turning traffic.
The E. Indianola Avenue Widening
from S.E. 14th Street to S.E. 16th Court project will
begin construction in 2009 and has an estimated cost of $4,700,000 that will be
funded from the following sources:
Traffic
Safety Improvement Program
$700,000 (includes
$200,000 in prior agreement)
Iowa
Clean Air Attainment Program $500,000
MPO
Surface Transportation Program $2,700,000
G.O.
Bonds $800,000
PREVIOUS COUNCIL ACTION(S):
Date:
September 22, 2008
Roll Call Number:
08-1641
Action: Approving Iowa Department of Transportation Agreement for E. Indianola Avenue Widening – S.E. 14th Street to S.E. 16th Court. (Council Communication No. 08-569
) Moved by Hensley to adopt. Motion Carried 7-0.Action: Approving Iowa Department of Transportation
Agreement for S.E. 14th Street and E. Indianola Avenue Intersection
Improvements. (Council
Communication No. 08-509) Moved
by Vlassis to adopt. Motion Carried 6-1.
Action: E. Indianola Avenue Widening – SE 14th
Street to Army Post Road Design Concept from public input meeting. (Council
Communication No. 08-115) Moved
by Meyer to adopt. Motion Carried 7‑0.
BOARD/COMMISSION
ACTION(S): NONE
ANTICIPATED ACTIONS
AND FUTURE COMMITMENTS:
Normal
actions for award of the construction contract for the work.