Council Office
of the City Manager |
Date |
May
4, 2009 |
||
|
Agenda Item No. 6D Roll Call No. 09- Communication
No. 09-289 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA
HEADING:
Ordering
construction of the following: 2009 Citywide
Portland Cement Concrete (PCC) Pavement Restoration Program - Receiving bids,
(5-19-09), and Setting date of hearing, (6-8-09). (Construction Estimate -
$200,080).
SYNOPSIS:
Recommend
the City Council proceed with construction of the improvement and set dates to
receive bids and hold a public hearing, as required by Iowa Code, utilizing the
method of financing referenced below. This
project provides for timely maintenance of PCC residential and arterial streets
utilizing full depth removal and replacement of distressed panels to improve
the surface condition and extend the useful life of
the streets.
FISCAL
IMPACT:
Amount: $200,080 City Engineer's Estimate
Funding
Source: 2009-2010 CIP, Page
Street-8, Concrete Paving Restoration Program - Public Works, STR102, Being: $200,080 in Fiscal Year 2009-2010 G. O. Bonds
to be issued.
ADDITIONAL
INFORMATION:
The
Engineering Department has prepared plans, specifications, form of contract
documents and the City Engineer’s estimate for the construction of the 2009
Citywide PCC Pavement Restoration Program, 06-2009-016. The improvement includes furnishing, placing,
curing, sawing and sealing PCC Pavement Patches of various thickness
in a cooperative effort with the City of Des Moines’ Public Works Department,
at the following locations in Des Moines, Iowa:
•Bel Aire Road – Beaver Avenue to
50th Street
•Merced
Avenue – 51st Street to 54th Street
•Urbandale
Avenue – Merle Hay Road to 50th Street
•Urbandale
Avenue – 64th Street to Merle Hay Road
•E.
Euclid Avenue – E. 42nd Street to E. 43rd Street
•E.
23rd Street – E. Madison Avenue to E. Aurora Avenue
•E.
24th Court – E. Madison Avenue to E. Aurora Avenue
•E.
29th Street – E. Euclid Avenue to E. Douglas Avenue
•E.
31st Street – E. Euclid Avenue to E. Douglas Avenue
•E.
Aurora Avenue – E. 23rd Street to E. 24th Court
•E.
Shawnee Avenue – at E. 24th Court
•Cummins
Parkway – University Avenue to Dagle Drive
•S.W.
62nd Street – Tonka Avenue to Railroad Avenue
•S.E.
31st Street – E. Porter Avenue to Easter Lake Drive.
The
estimated construction cost is $200,080.
The proposed plans, specifications and form of contract documents are
available for public inspection in the City Engineer's Office.
PREVIOUS
COUNCIL ACTION(S): NONE
BOARD/COMMISSION
ACTION(S): NONE
ANTICIPATED
ACTIONS AND FUTURE COMMITMENTS:
Anticipated
actions include public hearing, receive and file bids, designate lowest bidder
and approve contract and bond; also, partial payments to the contractor and
final acceptance of work.
For
more information on this and other agenda items, please call the City Clerk’s
Office at 515-283-4209 or visit the Clerk’s Office on the second floor of City
Hall, 400 Robert D. Ray Drive. Council
agendas are available to the public at the City Clerk’s Office on Thursday
afternoon preceding Monday’s Council meeting.