Council Office of the City Manager |
Date |
May
18, 2009 |
||
|
Agenda Item No. 7A Roll Call No. 09- Communication
No. 09-339 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA
HEADING:
Ordering
construction of the following: 2009
Parks Playground & Basketball Court Improvements - Receiving bids,
(6-9-09), and Setting date of hearing, (6-22-09). (Construction Estimate -
$205,500).
SYNOPSIS:
Recommend
the City Council proceed with construction of this improvement and set dates to
receive bids and hold a public hearing, as required by Iowa Code, utilizing the
method of financing referenced below. This
project provides for the installation of curbing and engineered wood fiber
surfacing for the existing playground equipment at
FISCAL
IMPACT:
Amount: $205,500 City Engineer's Estimate
Funding
Source: 2009-2010 CIP, Page
Parks-15,
ADDITIONAL
INFORMATION:
On May 18, 2008, under Roll Call No. 08-931, the
City Council rejected bids for the 2008 Park Playground Curbing project, which
included the installation of curbing and engineered wood fiber surfacing
for the existing playground equipment at
The
Engineering Department has prepared plans, specifications, form of contract
documents, and City Engineer’s estimate for the construction of the 2009 Parks
Playground & Basketball Court Improvements, 11-2008-008. The improvement includes the installation of
PCC basketball courts, PCC sidewalk and bike trails, PCC curb, modular
retaining walls, earthwork, and restoration; all in accordance with the
contract documents, including Plan File Nos. 504-039/047 at
The
estimated construction cost is $205,500.
The proposed plans, specifications, and form of contract documents are
available for public inspection in the City Engineer's Office.
PREVIOUS
COUNCIL ACTION(S):
Date: May 19, 2008
Roll
Call Number: 08-931
Action: Resolution to REJECT all bids and close the hearing on plans, specifications, form of contract documents and Engineer’s estimate for 2008 Playground Curbing, (bid security not valid). (Council Communication No. 08-300
) Moved by Coleman to adopt. Motion Carried 7-0.Action: Ordering
construction of the following: 2008
Park Playground Curbing – Receiving of bids, (5-6-08), and Setting date of
hearing, (5-19-08). (Construction
Estimate - $50,700). (Council
Communication No. 08-232) Moved
by Vlassis to adopt. Motion Carried 7-0.
BOARD/COMMISSION
ACTION(S): NONE