Council Office
of the City Manager |
Date |
June
8, 2009 |
||
|
Agenda Item No. 7B Roll Call No. 09- Communication
No. 09-383 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA
HEADING:
Ordering
construction of the following: E.
University Avenue/E. 30th Street Traffic Signal Interconnect Improvements -
Receiving bids, (6-16-09), and Setting date of hearing, (7-13-09). (Construction Estimate -
$469,000).
SYNOPSIS:
Recommend
the City Council proceed with construction of this improvement and set dates to
receive bids and hold a public hearing, as required by Iowa Code, utilizing the
method of financing referenced below. The
project provides for upgrading the existing traffic signal interconnect system
on
FISCAL
IMPACT:
Amount: $469,000 City Engineer's Estimate
Funding
Source: 2009-2010 CIP, Page
Traffic-6, City-wide Traffic Signal Interconnection, STR097, Being: $360,000 in Federal Funds under Iowa Clean
Air Attainment Program (ICAAP) for 80% of construction costs with a $360,000
maximum and $109,000 in G. O. Bonds
ADDITIONAL
INFORMATION:
The
Engineering Department has prepared plans, specifications, form of contract
documents, and City Engineer’s estimate for the construction of the E.
University Avenue/E. 30th Street Traffic Signal Interconnect Improvements,
04-2008-005. The improvements consist of
upgrading the existing traffic signal interconnect on E. University Avenue from
Hubbell Avenue to East of Williams Street and E. 30th Street from E. University
Avenue to Dean Avenue; all in accordance with the contract documents including
Plan File Nos.495-139/157, in the City of Des Moines, Iowa.
The
proposed plans, specifications, and form of contract
documents are available for public inspection in the City Engineer's Office.
PREVIOUS
COUNCIL ACTION(S):
Date: December 3, 2007
Roll Call Number: 07-2282
Action: No.
2008-ICAAP-03 for
BOARD/COMMISSION
ACTION(S): NONE
ANTICIPATED
ACTIONS AND FUTURE COMMITMENTS:
Anticipated
actions include public hearing, receive and file bids, designate lowest bidder,
and approve contract and bond; also partial payments to the contractor and
final acceptance of work.
For
more information on this and other agenda items, please call the City Clerk’s
Office at 515-283-4209 or visit the Clerk’s Office on the second floor of City
Hall,