Agenda Item No. 6C Roll Call No. 09- Communication
No. 09-417 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA
HEADING:
Ordering
construction of the following: 2009
Expanded Street Resurfacing Program - Contract 1 - Receiving bids, (7-14-09),
and Setting date of hearing, (7-27-09). (Construction Estimate - $1,122,600).
SYNOPSIS:
Recommend
the City Council proceed with construction of the improvement and set dates to
receive bids and hold a public hearing, as required by Iowa Code, utilizing the
method of financing referenced below. This
project provides for full depth patching, scarification of existing asphalt
streets, and hot mix asphalt (HMA) overlay of residential streets
citywide. The project addresses citizen
concerns regarding the condition of city streets by preserving deteriorating
infrastructure.
FISCAL
IMPACT:
Amount: $1,122,600 City Engineer's Estimate
Funding
Source: 2009-2010 CIP, Page
Street-42, Special City-wide Street Improvements, STR217, Being: Gaming Monies from the Agreement with Polk
County and The Racing Association of Central Iowa
ADDITIONAL
INFORMATION:
The
Engineering Department has prepared plans, specifications, form of contract
documents, and City Engineer’s estimate for the construction of the 2009
Expanded Street Resurfacing Program - Contract 1, 06-2009-019. The improvement includes scarification of
existing asphalt streets, furnish and place Hot Mix Asphalt (HMA) and other
incidental items in accordance with the contract documents, including Plan File
Nos. 506-008/016 at the following locations in Des Moines, Iowa:
• E.
17th Street from E. Grand Avenue to Lyon Street
• E.
24th Street from Guthrie Avenue to E. Hull Avenue
•
29th Street from Grand Avenue to Forest Drive
• E.
40th Street from E. Douglas Avenue to E. 39th Court
•
46th Street from Aurora Avenue to Twana Drive
• Bel Aire Road from Lower Beaver
Road to 890’ East of Lawnwoods Drive
•
Brentwood Drive from River Oaks Drive to Cul-de-sac West
•
Burlington Terrance from Chautauqua Parkway to Nash Drive
•
Carpenter Avenue from 39th Street to 360’ East of 39th Street
•
Chautauqua Parkway from Hickman Road to Stephenson Way
•
Douglas Avenue from 12th Street to 16th Street
•
Gilmore Avenue from 28th Street to 30th Street
•
Harwood Drive from 42nd Street to Polk Boulevard
•
Harwood Drive from Polk Boulevard to Woodland Avenue
•
Lyon Street from E. 25th Street to E. 29th Street
• Sandahl Avenue from North Union Street to E. 8th Street.
The
estimated construction cost is $1,122,600.
The proposed plans, specifications, and form of contract documents are
available for public inspection in the City Engineer's Office.
PREVIOUS
COUNCIL ACTION(S): NONE
BOARD/COMMISSION
ACTION(S): NONE
ANTICIPATED
ACTIONS AND FUTURE COMMITMENTS:
Anticipated
actions include public hearing, receive and file bids, designate lowest bidder,
and approve contract and bond; also partial payments to the contractor and
final acceptance of work.
For
more information on this and other agenda items, please call the City Clerk’s
Office at 515-283-4209 or visit the Clerk’s Office on the second floor of City
Hall, 400 Robert D. Ray Drive. Council
agendas are available to the public at the City Clerk’s Office on Thursday
afternoon preceding Monday’s Council meeting.