Agenda Item No. 61 Roll Call No. 09- Communication
No. 09-418 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA
HEADING:
Hearing
on 2009 Parks Playground & Basketball Court Improvements: Resolution approving plans, specifications,
form of contract documents, engineer’s estimate, receive and file bids, and
designating lowest responsible bidder as T K Concrete Inc., Tony J. VerMeer, President, $168,505.
SYNOPSIS:
This
is a public hearing to allow for public input on the 2009 Parks Playground
& Basketball Court Improvements and take the necessary actions as required
by Iowa Code to authorize a contract for construction of the proposed
project. This project provides for the
installation of curbing and engineered wood fiber surfacing for the existing
playground equipment at Woodlawn Park and Burke Park. New sidewalks and ramps will be constructed
to make the playgrounds handicapped accessible and improve access
for all users. Also included are the construction
of new basketball courts at Good Park and M.L. King Jr. Park, with new
sidewalks and ramps to improve access, and the construction of a ten foot wide
recreation trail connecting two sections of Three Lakes Parkway.
FISCAL
IMPACT:
Amount: $168,505 Construction Contract ($205,500 City
Engineer's Estimate)
Funding
Source: 2009-2010 CIP, Page
Parks-15, Neighborhood Park Improvements, PKS137, G. O. Bonds
ADDITIONAL
INFORMATION:
On May 18, 2008, under Roll Call No. 08-931, the
City Council rejected bids for the 2008 Park Playground Curbing project, which
included the installation of curbing and engineered wood fiber surfacing
for the existing playground equipment at Woodlawn Park and Burke Park. Staff has redesigned this work and in an
attempt to entice more bidders, has added the construction of new basketball
courts at Good Park and M.L. King Jr. Park, with new sidewalks and ramps to
improve access, and the construction of a ten foot wide recreation trail
connecting two sections of Three Lakes Parkway to the project, which is now
called the 2009 Parks Playground & Basketball Court Improvements project.
On
May 18, 2009, under Roll Call No. 09-818, the City Council received and filed
plans, specifications, form of contract documents, and City Engineer's estimate
for the construction of the 2009 Parks Playground & Basketball Court
Improvements. Before the City Council
can enter into a contract, it must hold a public hearing and approve the
proposed plans, specifications, and form of contract documents and engineer's
estimate for the construction of the 2009 Parks Playground & Basketball
Court Improvements, 11-2008-008. The
improvement includes the installation of PCC basketball courts, PCC sidewalk
and bike trails, PCC curb, modular retaining walls, earthwork, and restoration;
all in accordance with the contract documents, including Plan File Nos.
504-039/047 at Woodlawn Park, Lawnwoods Drive and
Twana Drive; Burke Park, E. 6th Avenue and E. University Avenue; Good Park,
17th Street and Atkins Street; M.L. King Park, E. 17th Street and Garfield
Avenue; and Three Lakes Parkway, South of E. Army Post Road, Des Moines, Iowa.
Sealed
bids for said improvement were submitted by the following bidders:
T K
Concrete Inc., Pella, IA - Bid read under advisement
MPS
Engineers, P.C., West Des Moines, IA
Elder
Corporation, Des Moines, IA
Ti-Zack
Concrete, Inc., LeCenter, MN - Bid read under
advisement
Johnson
Concrete & Petroleum Const. Inc., Des Moines, IA
Rocky
Hurst Construction, Inc., Truro, IA - Bid not read
The
bids were received and opened at a public meeting presided over by the City
Engineer in the City Council Chambers, 2nd Floor, City Hall, 400 Robert D. Ray
Drive, Des Moines, Iowa at 11:00 a.m. on June 9, 2009, and the bid
received from T K Concrete Inc., Tony J. VerMeer,
President, 1608 Fifield Road, Pella, Iowa, 50219, was
read under advisement because Proposal: Part B- Acknowledgement of Addenda was
not properly completed in that T K Concrete Inc. did not acknowledge receipt of
Addendum Number 1, which was issued by the City of Des Moines on June 5,
2009. Engineering Department Staff
contacted Ms. Sherry Bokhoven, Office Manager for T K
Concrete Inc., and Mr. Tony J. VerMeer, President of T K Concrete Inc., has provided a
letter dated June 10, 2009, which states that T K Concrete Inc. acknowledges
receipt of said Addendum Number 1, will comply with the requirements, and
agrees to perform the work at the bid price on its proposal; and after further
review, the Engineering and Legal Departments have determined that this was a
minor irregularity that could be waived by the City Council.
The
City Engineer has determined that the lowest responsive, responsible bid for
the construction of said improvement was submitted by T K Concrete Inc., Tony
J. VerMeer, President, 1608 Fifield Road, Pella, IA, 50219 in the amount of $168,505,
and said bid should be accepted. The
Finance Director has determined that funds are available for said improvement
as stated above.
PREVIOUS
COUNCIL ACTION(S):
Date: May 18, 2009
Roll Call Number:
09-818
Action: Ordering construction of the following: 2009 Parks Playground & Basketball
Court Improvements – Receiving of bids, (6-9-09), and Setting date of hearing,
(6-22-09). (Construction
Estimate - $205,500). Council Communication No. 09-339) Moved by Kiernan to adopt.
Motion Carried 6-1. Absent: Cownie.
Date: May 19, 2008
Roll
Call Number: 08-931
Action: Resolution to REJECT all bids and close the hearing on plans, specifications, form of contract documents and Engineer’s estimate for 2008 Playground Curbing, (bid security not valid). (Council Communication No. 08-300
) Moved by Coleman to adopt. Motion Carried 7-0.Action: Ordering
construction of the following: 2008
Park Playground Curbing – Receiving of bids, (5-6-08), and Setting date of
hearing, (5-19-08). (Construction
Estimate - $50,700). (Council
Communication No. 08-232) Moved
by Vlassis to adopt. Motion Carried 7-0.
BOARD/COMMISSION
ACTION(S): NONE
ANTICIPATED
ACTIONS AND FUTURE COMMITMENTS:
Partial
payments to the contractor and final acceptance of work.