Council Office
of the City Manager |
Date |
October
26, 2009 |
||
|
Agenda Item No. 5A Roll Call No. 09- Communication
No. 09-750 Submitted
by: Jeb E. Brewer, P.E. City Engineer |
||||
AGENDA
HEADING:
Ordering
construction of the following: Police
Department Metro Star Building Improvements - Receiving bids, (11-24-09), and
Setting date of hearing, (12-7-09). (Construction Estimate - $416,300).
SYNOPSIS:
Recommend
City Council proceed with construction of the improvement and set dates to
receive bids and hold a public hearing, as required by Iowa Code, utilizing the
method of financing referenced below. This
building currently houses the Police Department’s Metro Special Tactics and
Response Team, and other specialized functions.
This building needs extensive remodeling and improvements, including new
locker room facilities, office space, interview room, energy efficient heating
and cooling for the new spaces, and storage space for functions that will
relocate to this building at the conclusion of
construction.
FISCAL
IMPACT:
Amount: $416,300 City Engineer's Estimate with
add-alternates ($389,500 base bid only)
Funding
Source: 2009-2010 CIP, Page
Building-7, Colosimo Property, BLD080, TIF-Backed G. O. Bonds
ADDITIONAL
INFORMATION:
The
Engineering Department has prepared plans, specifications, form of contract
documents, and City Engineer’s estimate for the construction of the Police
Department Metro Star Building Improvements, 10-2008-018. The improvements include improved exhaust,
heating and ventilation in the vehicle storage area; new men's and women's
locker rooms with restroom facilities; open office space; private offices;
interview room; storage space; conference room; increased electrical service to
the building; energy efficient heating and cooling for the new spaces; and
exterior site improvements to control the water infiltration into the building;
all in accordance with the contract documents including Plan File Nos.
484-091/123, located at 101/103 E. 2nd Street, Des Moines, Iowa.
The
estimated construction cost is $416,300.
The proposed plans, specifications, and form of contract documents are
available for public inspection in the City Engineer's Office.
PREVIOUS
COUNCIL ACTION(S): NONE
BOARD/COMMISSION
ACTION(S): NONE
ANTICIPATED
ACTIONS AND FUTURE COMMITMENTS:
Anticipated
actions include public hearing, receive and file bids, designate lowest bidder,
and approve contract and bond; also partial payments to the contractor and
final acceptance of work.
For
more information on this and other agenda items, please call the City Clerk’s
Office at 515-283-4209 or visit the Clerk’s Office on the second floor of City
Hall, 400 Robert D. Ray Drive. Council
agendas are available to the public at the City Clerk’s Office on Thursday
afternoon preceding Monday’s Council meeting.
Citizens can also request to receive meeting notices and agendas by
email by calling the Clerk’s Office or sending their request via email to
cityclerk@dmgov.org.