Ordering construction of the following:  Army Post Road Widening - S.W. 9th Street to S.E. 5th Street - Receiving bids, (11-17-09), and Setting date of hearing, (12-7-09).  (Construction Estimate - $2,072,906.75).

 

 

SYNOPSIS:

 

Recommend the City Council proceed with construction of this improvement and set dates to receive bids and hold a public hearing, as required by Iowa Code, utilizing the method of financing referenced below.  On April 20, 2009, the City Council approved an Iowa Department of Transportation (IDOT) Agreement for Federal Stimulus project funding under the American Recovery and Reinvestment Act (ARRA) of 2009 for a maximum amount of $1,000,000 for Army Post Road Widening from S.W. 9th Street to S.E. 5th Street.  Previously, the City Council had approved two agreements with the IDOT for Traffic Safety Improvement Program funding for this project for a maximum amount of $1,000,000.  The proposed improvements include widening Army Post Road to a five-lane roadway to provide two through lanes in each direction and a center two-way left-turn lane.

 

 

FISCAL IMPACT:

 

Amount:  $2,072,906.75 City Engineer's Estimate

 

Funding Source:  2009-2010 CIP, Page Street-5, Army Post Widening - SE 5th to SW 9th, STR229, being: 

• $1,000,000 maximum in Federal Stimulus Funds under the American Recovery and Reinvestment Act of 2009 under agreement ESL-1945(758)--7S-77 

• $500,000 maximum in Iowa DOT Traffic Safety Funds under agreement CS-TSF-1945(731)--85-77 for Army Post Road Widening from SW 9th Street to South Union Street

• $500,000 in Iowa DOT Traffic Safety Funds under agreement CS-TSF-1945(713)--85-77 for Army Post Road Widening from  South Union Street to SE 5th Street

• $72,906.75 in G.O. Bonds from 2009-10 CIP, Page Street-4, Army Post Widening – S.E. 5th to S.W. 9th, STR229

 

 

ADDITIONAL INFORMATION:

 

On October 23, 2006, Council approved and authorized the execution of an IDOT agreement for Army Post Road Widening from South Union Street to S.E. 5th Street.  This agreement provided $500,000 in Traffic Safety Improvement Funds for this segment of the project.  On September 24, 2007, City Council approved and authorized the execution of the IDOT agreement for Army Post Road widening from South Union Street to S.W. 9th Street.  This agreement also provided $500,000 in Traffic Safety Improvement Funds for this segment of the project.  These two segments will be combined into one project for construction from S.E. 5th Street to S.W. 9th Street.

 

A number of transportation-related projects were submitted to and approved by the Des Moines Area Metropolitan Planning Organization Executive Committee at their January 29, 2009 meeting for funding under the American Recovery and Reinvestment Act of 2009.  The funding request for Army Post Widening Project – S.E. 5th Street to S.W. 9th Street was approved, and IDOT prepared Agreement No. 01-09-ESP-035 for Federal Stimulus funds up to a maximum amount of $1,000,000 for Army Post Road Widening from S.E. 5th Street to S.W. 9th Street, which was approved by the City Council on April 20, 2009.  This project will improve traffic capacity and increase the safety on Army Post Road within the project limits.

 

The Engineering Department has prepared plans, specifications, form of contract documents, and City Engineer’s estimate for the construction of the Army Post Road Widening - S.W. 9th Street to S.E. 5th Street, 06-2009-005.  The improvement includes the construction of a center two-way left-turn lane by the removal and replacement of curbs, placement of  9-inch Portland cement concrete pavement base widening with a 3-inch HMA overlay, median modifications, storm drainage, subdrain, subbase placement, driveways, sidewalks, traffic signal construction at S.E. 3rd Street, pavement markings, sodding and miscellaneous associated work including cleanup; all in accordance with the contract documents, including Plan File Nos. 507-001/126, located on Army Post Road between S.W. 9th Street and S.E. 5th Street.

 

The proposed plans, specifications, and form of contract documents are available for public inspection in the City Engineer's Office.

 

 

PREVIOUS COUNCIL ACTION(S):

 

Date:  April 20, 2009

 

Roll Call Number:  09-612

 

Action:  Authorizing execution of Iowa Department of Transportation (IDOT) Agreement for Army Post Road Widening from SE 5th to SW 9th.  Moved by Vlassis to adopt.  Motion Carried 7-0.

 

Date:  April 20, 2009

 

Roll Call Number:  09-613

 

Action:  (A)  Authorization to proceed with acquisition of necessary right-of-way and easements.  (Council Communication No.  09-242) Moved by Vlassis to adopt.  Motion Carried 7-0.

Date:  September 24, 2007

 

Roll Call Number:  07-1818

 

Action:  Approving agreement with Iowa Department of Transportation for Army Post Road widening from South Union Street to SW 9th Street.  (Council Communication No. 07-577)  Moved by Kiernan to adopt.  Motion Carried 7-0.

 

Date:  October 23, 2006

 

Roll Call Number:  06-2064

 

Action:              Approving execution of Iowa Department of Transportation Agreement for E. Army Post Road widening from South Union Street to SE 5th Street.  (Council Communication No. 06-665)  Moved by Hensley to adopt. Motion Carried 6-0.

 

Date:  July 24, 2006

 

Roll Call Number:  06-1472

 

Action:  Traffic Safety Fund Applications to the Iowa Department of Transportation for the following projects: (Council Communication No. 06-464) Moved by Hensley to adopt.  Motion Carried 7-0.

(A)   Army Post Widening from South Union to SW 9th Street.

(B)   Hickman Road Re-striping between 30th Street and Merle Hay Road, Including Traffic Signals at 48th Street and Hickman Road.

(C)   42nd Street at Kingman Boulevard Traffic Signal/Street Widening Improvements.

(D)   Hubbell Avenue and Easton Boulevard Intersection Traffic Signal Upgrading.

 

 

BOARD/COMMISSION ACTION(S):  NONE

 

 

ANTICIPATED ACTIONS AND FUTURE COMMITMENTS:

 

Anticipated actions include public hearing, receive and file bids, designate lowest bidder, and approve contract and bond; also partial payments to the contractor and final acceptance of work.

 

 

 

 

For more information on this and other agenda items, please call the City Clerk’s Office at 515-283-4209 or visit the Clerk’s Office on the second floor of City Hall, 400 Robert D. Ray Drive.  Council agendas are available to the public at the City Clerk’s Office on Thursday afternoon preceding Monday’s Council meeting.  Citizens can also request to receive meeting notices and agendas by email by calling the Clerk’s Office or sending their request via email to cityclerk@dmgov.org.