Council |
Date |
November
23, 2009 |
||
|
Agenda Item No. 8 Roll Call No. 09- Communication
No. 09-825 Submitted
by: Jeb E. Brewer, P.E. City Engineer
|
||||
AGENDA
HEADING:
Approving
contract and bond for construction of an improvement, of which the estimated
cost is less than the Iowa Code competitive bid threshold, Blank Park Zoo
Parking Lot Relighting, Baker Electric, Inc., Britt Baker, CEO, 111
Jackson Avenue, Des Moines, IA 50315, $50,390.
SYNOPSIS:
Recommend
receive and file bids, designate lowest bidder and approve contract and bond
for Blank Park Zoo Parking Lot Relighting, 11-2010-004. The work includes replacing the light poles on
the west side of the main parking lot with new pole-mounted metal halide
fixtures. Competitive quotations for
construction of the repair work were received by the Engineering Department, in
accordance with Chapter 26 of the Code of Iowa.
FISCAL
IMPACT:
Amount: $50,390 Construction Contract
Funding
Source: 2009-2010 CIP, Page
Park-4, Blank Park Zoo Improvements, PKS013, G. O.
Bonds.
ADDITIONAL
INFORMATION:
Sections
26.3 and 26.12 of the Code of Iowa exempt the governing body from advertisement
for sealed bids and holding a public hearing on the proposed plans,
specifications, form of contract and estimated cost of the improvement when the
Engineer's estimated cost for the improvement is less than the competitive bid
threshold ($100,000) established in Section 314.1B.
On
February 12, 2007, under Roll Call Number 07-291, the Des Moines City Council
approved bidding and contracting process changes for construction of
improvements, which included “Part II: New Competitive Quotation Process for
Public Improvements,” which the City Engineer has utilized for this project. Engineering and Legal Department Staff have
utilized this process to determine the lowest responsive, responsible bidder
for construction of the following improvement.
These bidding and contracting process changes were also approved by the
Des Moines International Airport Board on March 6, 2007, under Resolution
Number A07-51. The estimated cost of
said improvement is $55,500, which is less than the competitive bid threshold
established in Section 314.1B of the Code of Iowa.
The
Engineering Department has prepared plans, specifications, form of contract
documents and Jurisdictional Engineer’s estimate for the construction of the
following improvement:
Blank
Park Zoo Parking Lot Relighting, 11-2010-004
The
improvement includes replacing the light poles on the west side of the main
parking lot with new pole-mounted metal halide fixtures around the north, west and east sides, adding
new low-voltage suspended lighting to the diagonal walkway bisecting the lot
and at the southeast end of the walkway in the courtyard, and replacing
existing wall mounted fixtures on the Service Building with new LED wall packs;
all in accordance with the contract documents, including Plan File Nos.
484-124/126 at the Blank Park Zoo, 7401 SW 9th Street, Des Moines, Iowa.
Said
plans and specifications were issued to contractors that normally bid on City
of Des Moines projects of a similar nature, as part of a solicitation for
proposals for said improvement, requesting the contractors to submit proposals
to the Des Moines City Engineer on or before 11:00 a.m. on November 9, 2009.
Bids
for said improvement were submitted by the following bidders:
Baker
Electric, Inc., Des Moines, IA
Wolin Electric LLC, West Des Moines, IA
Stroh
Corporation, Des Moines, IA
Biermann's University Electric Company, Inc., Des
Moines, IA
The
Waldinger Corporation, Des Moines, IA
Commonwealth
Electric Company, Des Moines, IA
Premier
Electric, Runnells, IA
The
Des Moines City Engineer has determined that the lowest responsible, responsive
bid was submitted by Baker Electric, Inc. and recommends that said bid be
accepted.
The
Des Moines City Engineer has secured execution of contract documents for said
public improvements by the lowest responsive, responsible bidder for
presentation to the City Council for approval and authorization for the Mayor
to sign.
PREVIOUS
COUNCIL ACTION(S): NONE
BOARD/COMMISSION
ACTION(S): NONE
ANTICIPATED
ACTIONS AND FUTURE COMMITMENTS:
Partial Payments to the Contractor and final acceptance of work.
For
more information on this and other agenda items, please call the City Clerk’s
Office at 515-283-4209 or visit the Clerk’s Office on the second floor of City
Hall, 400 Robert D. Ray Drive. Council
agendas are available to the public at the City Clerk’s Office on Thursday
afternoon preceding Monday’s Council meeting.